PROJECT HUB

Shoring models

Open Project Hub

Saved shoring models

CROSS SECTION A–A

Final excavation

Excavation level −8.0 m
Scroll to zoom · drag empty space to pan
Select an object to edit its properties x — m   z — m
STAGE REVIEW 05 / Final excavation
6 of 6
STAGED ANALYSIS

Prepare analysis

Smooth Paving uses quads with triangular transitions for Q8, or triangles throughout for T6. Both use shared quadratic midside nodes.

Use smaller spacing near the wall and excavation. Enter 0 for uniform meshing.

Enter 0 to follow the soil mesh. Separate wall spacing requires frictional wall contact.

Mesh sensitivity compares results at nearby mesh sizes. Your current model and results are retained.

Check mesh sensitivity and engineering assessments before using results for design. See the manual for analysis assumptions and limitations.

INPUT DATA