Production Q8 comparison recorded 8 October 2026: drained Mohr-Coulomb Case A, excavation to 6 m, bonded wall interface and published wall self-weight included.

Published reference

DIANA's sheet-pile-wall benchmark documents the domain, wall, supports, surcharge, mesh and staged excavation. Its Mohr-Coulomb results compare DIANA with PLAXIS for dry and groundwater cases. This ShoreKALC study covers the dry Case A only.

DIANA finite element model and construction stages
DIANA Mohr-Coulomb results and PLAXIS comparison

Production Q8 wall profiles

Production Q8 wall displacement, moment, shear and axial-force profiles against digitised DIANA and PLAXIS references
Recorded Q8 quantityPeak magnitude
Wall movement34.13 mm
Bending moment292.66 kNm/m
Shear force95.15 kN/m
Axial force121.43 kN/m

Interpretation and scope

The recorded production model contains 2,390 nodes and completes all five stages. Q8 movement, moment and shear are approximately 5% below the digitised DIANA peaks; axial force is approximately 0.7% below. The published PLAXIS and DIANA curves also differ.

Reference curves were digitised from published figures, rather than supplied as raw numerical arrays. This dry bonded-interface benchmark supports the demonstrated comparison; it does not establish general mesh independence or validation of the groundwater cases. Original geometry, wall stiffness and soil parameters were retained without fitting to the reference.