Notes:
1- Recommended pilecap depth should be within 0.25~0.3x(8Dia+600), it must be as well sufficient to meet anchorage-bond length requirements of starter bars and normal and punching shear requirements.
2- Reinforcement shown is limited to the line connecting the piles, or the ties in other words. The user is advised to provide similar REO in the areas outside of piling/tie zone
3- User may use the strut and tie app for walls to design piles caps (straightforward for 2 piles, and by superpositioning models for 3, 4, and 5 piles)